Build it Base is a strong base coat designed for building, meaning it has a higher viscosity than our Base or Rubber Base. Because of this, removal can take slightly longer than usual.
To speed up the process, file down the top layer more than you normally would before soaking. Then, let the soaked Remover Wraps sit for at least 15 minutes.